Getting Wired

From the outside, it doesn't look like too much got done at the new building site this past week. A little more of the roof is up. Some more siding has been added to the back wall. Wall studs are being added to the steeple structure. Inside, however, some interesting things are going on. Electrical wiring is being run throughout the building. Outlets are appearing in each of the classrooms and offices. That will be a huge improvement over the education building we're in now: adequate outlets and power. It will be nice to be able to turn on a heater without shutting off the lights in the entire building!

The back wall of the building is almost complete, and the back wall of the sanctuary is starting to take shape.

Our building after the first week in March. Those skies give an indication of what March weather in the mountains can be like! Pray that construction can continue on schedule.