I've been gone on a Spring break vacation with my family, so I've got some catching up to do on what's been going on at the new building site. The first thing I noticed was that our building has a steeple now!
Workers began putting up the stone that will cover the front of the building. It looks good already!
One addition that I wasn't glad to see was a padlocked front door; no more interior shots for a while, I guess.
Saturday, April 19, 2008
Tuesday, April 08, 2008
An Inside Job
I didn't take any photos of the outside of the building this week. It looked just like it did week ago. Most of the work is going on inside now as walls, plumbing, and wiring continue to go in. The most noticeable amount of work was in the front of the building in the platform area
This photo shows the aluminum floor joists and railing that have been installed in the last week or so.
I think this will be a changing room for baptisms. You're looking through the doorway that will lead to the baptistry.
This photo shows the aluminum floor joists and railing that have been installed in the last week or so.
I think this will be a changing room for baptisms. You're looking through the doorway that will lead to the baptistry.