As more wall frames went up to further define the office area of the new building, the entrance foyer also began to take shape. The counter frame for what I'm guessing will be a welcome area for visitors is in place. It willl be visible as soon as one enters the building. From there, one can proceed into the sanctuary, to the church offices, or down one of the halls to the classroom areas.
The steel skeleton on the front of the building shines in the morning sunlight.
Saturday, February 23, 2008
Saturday, February 16, 2008
Continued Progress
Despite the ever-changing mountain weather, work on the new building continues to progress at what seems like a rapid pace. I only get to visit the building site once a week, and I'm usually amazed at how much work has been done since my last visit. (Click on photos to enlarge.)
More walls for classrooms on the right side classroom wing. This view is looking toward the front of the building.
Looking across the back of the sanctuary with office area to the left of the photo.
More walls for classrooms on the right side classroom wing. This view is looking toward the front of the building.
Looking across the back of the sanctuary with office area to the left of the photo.
Saturday, February 09, 2008
Cover-up Revealed At New Building Site
That's right, part of that soon-to-be-a-landmark blue roof was put up this week. You can't hide something as distinctive as a blue roof for long. Soon the entire roof will be covered with that pretty blue sheet metal, making our new building a real eye-catcher on Crabtree Rd. (Click on photos to enlarge.)
By the way, we'll need more than one person to lock all those doors after services. Better get the sign-up sheet started early!
Looking out of the future main entrance to the building, showing the frame for the entrance way covering.
This view shows the front of the building with the wall studs and front window openings.
By the way, we'll need more than one person to lock all those doors after services. Better get the sign-up sheet started early!
Looking out of the future main entrance to the building, showing the frame for the entrance way covering.
This view shows the front of the building with the wall studs and front window openings.
Sunday, February 03, 2008
Filling In The Gaps
The steel frame is up, and now the construction crew is putting up walls. Metal wall studs are beginning to close in the sanctuary area, and the sheet metal on the left hall continues to grow. Wall studs appeared on the front of the building also. Despite the sometimes uncooperative mountain weather, our building continues to inch toward completion.